Goodview Master #1

Project Description

This was another builder-basic bathroom where our objective was to fix all the design mistakes that the builder made. We gutted the poorly designed and poorly built shower, the vanity, the floor, and then dressed up and properly supported the tub which had to stay in place due to budget. We mirrored the existing arched window in the shower by creating an arched entry to the shower.